· Construction · Estimates · Projects

Full project control for construction.

From project estimation to KS-2 completion act, from subcontractor invoicing to per-object P&L reporting — one system. Includes AR-standard estimation norms and K1-K3 forms. Full 1C:Smeta integration.

Estimate format
K1-K3 (AR)
EVM
SV/CV/CPI/SPI
Material balance
Real-time
01 What we see most often

Common pain points

02 COMPLEX.AZ answers.

How we solve it

1C:Smeta integration

K1-K3 forms included, resource method and norm comparison method, material prices auto-loaded from AR State Statistics Committee

Project budgeting + EVM

For each work package: planned value, actual cost, earned value. SV/CV/CPI/SPI metrics

Real-time material balance

Every material receipt, store, withdrawal — visible instantly. Low-stock alerts

Subcontractor tracking

Separate contract for each subcontractor, milestone payments, actual volume acts

KS-2 and KS-3 acts

Generated in system, sent to customer automatically (e-VHF integration included)

Per-object P&L

Each project in separate analytic, turnover-based real cost and profit visible immediately

03 Configuration for you

Required modules

04 Customer case

Mid-size construction company (5 simultaneous projects)

Before

Estimates in Excel, KS-2 acts manual, no subcontractor tracking. Project actual P&L known only at completion, 2 projects ran at loss.

After

Real-time per-project P&L, estimate changes in 2 hours, subcontractor acts systematized. Next 8 projects all met planned profit margins.

05 FAQ

Frequently asked

How does 1C:Smeta integration work?

COMPLEX.AZ + 1C:Smeta full bidirectional integration: estimate changes flow into budget automatically, actual costs flow back to estimate for comparison.

Are K1-K3 forms included?

Yes, AR-standard estimate forms (K1 — approximate, K2 — object, K3 — summary) included. AR State Statistics Committee material price base auto-updates.

How are subcontractor jobs tracked?

Separate contract per subcontractor — scope, price, payment schedule. Actual volume acts entered into system, payment auto-calculated.

What is EVM (Earned Value Management)?

EVM is a methodology for measuring project health. System calculates 4 metrics: PV (planned value), AC (actual cost), EV (earned value), CPI/SPI (performance indices).

How does material price change flow into system?

Integration with AR State Statistics Committee material price base — monthly auto-update. Manual update also possible.

How is per-object P&L reported?

Each object registered as separate analytic — all costs (materials, payroll, subcontractor, equipment depreciation) tied to that object. Profit calculated in real-time.

Continue

→ /industry/manufacturing→ /industry/wholesale→ Home

Free audit & pricing

30-min consultation about your construction company — no commitment.

Chat on WhatsApp [email protected] Fill the form