· Manufacturing · MRP · APS

MRP-II planning for manufacturing.

For manufacturers: from order to finished product with full traceability. MRP-II material planning, APS production scheduling, WIP tracking, real costing, quality certification. Industry 4.0 ready.

Planning
MRP-II + APS
BOM
Multi-level
WIP
Real-time
01 What we see most often

Common pain points

02 COMPLEX.AZ answers.

How we solve it

MRP-II material planning

When order arrives, instantly calculates required materials, sends missing ones to purchasing

APS production scheduling

Optimizes equipment and worker loading — real "ready by" date calculated in 30 seconds

Multi-level BOM

Component → semi-finished → finished product hierarchy, change propagation visible at each level

Real-time costing

Each workstation reports (material cost, labor, depreciation) — actual finished product cost known

WIP tracking

Work-in-progress visible real-time, hidden capital exposed

Quality control

Per-batch quality requirements, measurements, certificate auto-generated

03 Configuration for you

Required modules

04 Customer case

Light industry manufacturer (furniture workshop, 80 employees)

Before

Order ready-by dates averaged 4 days late, annual penalties 35,000 AZN. WIP held capital for 2 months.

After

APS schedule made ready-by dates fully reliable, 0% delay. WIP dropped from 6 weeks to 2 weeks (1.2 mln AZN capital freed).

05 FAQ

Frequently asked

What is MRP-II and do we need it?

MRP-II (Manufacturing Resource Planning) instantly calculates material requirements from orders. If you have many orders, being able to quote accurate ready-by dates is a competitive advantage.

Can BOM (Bill of Materials) be multi-level?

Yes, each level has its composition — component → semi-finished → module → finished. Changes at lower level auto-propagate to affected upper components.

How does APS differ from MRP?

MRP tells you WHAT is needed, APS also tells you WHEN and on WHICH resource production happens. APS considers equipment capacity, worker availability, priorities.

How is real-time costing calculated?

Each workstation reports material use, labor minutes, equipment hours. System ties these to the product and calculates real cost. Standard vs actual cost comparison automatic.

Is Industry 4.0 ready?

Yes — sensor integration (equipment hours, temperature, vibration), barcode/QR scan for operation logging, real-time dashboard.

Why track WIP (work-in-progress)?

To see capital tied up in WIP. More WIP = more locked money. System shows WIP by area/product/day, enables optimization.

Continue

→ /industry/agribusiness→ /industry/wholesale→ Home

Free audit & pricing

30-min consultation about your manufacturing — no commitment.

Chat on WhatsApp [email protected] Fill the form